Tipper - The Critical Path mp3 flac
Free Download links
1549 downloads at 34 mb/s
ZIP archive full MP3 version
1831 downloads at 32 mb/s
ZIP archive full FLAC version
Size ZIP MP3 version: 1549 mb
Size ZIP FLAC version: 1831 mb
Size ZIP FLAC version: 1831 mb
Tracklist Hide Credits
| 1 | Seldom Vile | 5:15 |
| 2 | L.E.D DownLyrics By – TipperVocals – Sophie Barker |
4:40 |
| 3 | Turn | 5:20 |
| 4 | Twister | 4:51 |
| 5 | Sort Code | 5:51 |
Companies, etc.
- Phonographic Copyright (p) – Sony Music Entertainment (UK) Ltd.
- Copyright (c) – Sony Music Entertainment (UK) Ltd.
- Published By – Chrysalis Music Ltd.
Credits
- Arranged By [Strings] – Noel Vine (tracks: 2, 3), Tipper (tracks: 2, 3)
- Artwork [Airbrush Art] – Adrian Chestermann*
- Design – The Designers Republic
- Strings – City String Orchestra (tracks: 2, 3)
- Written-By, Producer – Tipper
Notes
Promotional sampler for The Critical Path album.Sony Music Entertainment (UK) Ltd decline any responsibility for loss, damage or death as a result of exploiting this Tipper production.
Original sound recording made by Sony Music Entertainment (UK) Ltd. The copyright in the sound recording is owned by Sony Music Entertainment (UK) Ltd. ℗ 1999 Sony Music Entertainment (UK) Ltd. © 1999 Sony Music Entertainment (UK) Ltd.
Barcode and Other Identifiers
- Rights Society: MCPS/BIEM/SDRM
- Matrix / Runout: SONY MUSIC IFPI L551 S0100281752-0101 11 A2
- Mastering SID Code: IFPI L551
- Mould SID Code: IFPI 946C
Other versions
| Category | Artist | Title (Format) | Label | Category | Country | Year |
|---|---|---|---|---|---|---|
| HG 039 | Tipper | The Critical Path (2x12", Promo) | Higher Ground | HG 039 | UK | 1999 |
Performer: Tipper
Album Title: The Critical Path
Label: Higher Ground – HGCD29
Type: CD, Promo, Sampler
Country: UK
Date of released: 1999
Category: Electronic
Style: Breakbeat, Abstract
Rating: 3.6/5
Votes: 449
Other Formats: AU DTS ADX VQF AUD AHX MIDI
Album Title: The Critical Path
Label: Higher Ground – HGCD29
Type: CD, Promo, Sampler
Country: UK
Date of released: 1999
Category: Electronic
Style: Breakbeat, Abstract
Rating: 3.6/5
Votes: 449
Other Formats: AU DTS ADX VQF AUD AHX MIDI
Related to Tipper - The Critical Path: